← FAA Federal Register actions

Airworthiness Directives; BAE Systems (Operations) Limited Airplanes

airworthiness · Rule · Final rule. · Published 2023-02-07 · Effective 2023-03-14 · 88 FR 7851

Document

Document number
2023-02526
Federal Register citation
88 FR 7851
Type
Rule
Action
Final rule.
Category
airworthiness
Manufacturer
BAE Systems (Operations) Limited
Publication date
2023-02-07
Effective date
2023-03-14
FAA docket
Docket No. FAA-2022-1298

Abstract

The FAA is superseding Airworthiness Directives (ADs) 2005-15- 11, 2016-07-09, and 2018-19-24, which applied to all BAE Systems (Operations) Limited Model 4101 airplanes. AD 2005-15-11 required repetitive detailed and specialized inspections to detect fatigue damage in the fuselage, replacement of certain bolt assemblies, and corrective actions if necessary. AD 2016-07-09 required a revision of the maintenance or inspection program, as applicable. AD 2018-19-24 required a one-time detailed inspection of a certain fuselage frame and repair, if necessary, and a revision of the maintenance or inspection program, as applicable, to incorporate new or revised maintenance instructions and airworthiness limitations. This AD was prompted by a determination that new or more restrictive airworthiness limitations are necessary. This AD continues to require the actions in ADs 2016-07- 09 and 2018-19-24 and requires revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive airworthiness limitations. The FAA is issuing this AD to address the unsafe condition on these products.

Source

Authoritative
Federal Register document
Machine
JSON-LD · Markdown