# Airworthiness Directives; General Electric Company Turbofan Engines
> **Rule** · Final rule. · Published 2023-04-05 · Effective 2023-05-10 · 88 FR 20067
## Document
- **Document number:** 2023-07005
- **Category:** airworthiness
- **Manufacturer:** General Electric Company Turbofan
- **Type:** Rule
- **Action:** Final rule.
- **Citation:** 88 FR 20067
- **Publication date:** 2023-04-05
- **Effective date:** 2023-05-10
- **FAA docket:** Docket No. FAA-2022-1240
## Abstract

The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) GE90-76B, GE90-85B, GE90-90B, and GE90-94B model turbofan engines. This AD was prompted by a commanded in-flight shutdown (IFSD) due to cracking and rockback of the high- pressure turbine (HPT) stage 2 nozzles resulting in blade liberation, severe rotor imbalance, and liberation of the exhaust centerbody. This AD requires initial and repetitive borescope inspections (BSIs) of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles and, depending on the results of the inspections, removal and replacement of the HPT stage 2 nozzles with parts eligible for installation. As a mandatory terminating action to the repetitive BSIs of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles, this AD requires replacing the HPT stage 2 nozzles. The FAA is issuing this AD to address the unsafe condition on these products.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2023/04/05/2023-07005/airworthiness-directives-general-electric-company-turbofan-engines)
---