Airworthiness Directives; British Aerospace Jetstream Model 3101 Airplanes
airworthiness · Rule · Direct final rule; confirmation of effective date. · Published 1999-03-01 · 64 FR 9912
Document
Document number
99-4889
Federal Register citation
64 FR 9912
Type
Rule
Action
Direct final rule; confirmation of effective date.
Category
airworthiness
Manufacturer
British Aerospace Jetstream Model 3101
Publication date
1999-03-01
FAA docket
Docket No. 98-CE-99-AD
Abstract
This action confirms the effective date of Airworthiness Directive (AD) 99-01-06, which applies to certain British Aerospace Jetstream Model 3101 airplanes. AD 99-01-06 requires installing a standard bonding socket that is fitted flush with the upper surface of each wing at the fueling points (Station 297). This AD is the result of mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for the United Kingdom. The actions specified in this AD are intended to correct a potentially insufficient ground contact between the refueler hose nozzle and the aircraft, which, if not corrected before the fuel cap is removed, could result in sparks with a consequent fire and/or explosion in the fuel tank.