# Defense Federal Acquisition Regulation Supplement; Excessive Pass-Through Charges
> **Defense Federal Acquisition Regulations System** · Final rule. · Published 2010-08-10 · Effective 2010-08-10 · 75 FR 48278
## Document
- **Document number:** 2010-19672
- **Category:** dfars-acquisition
- **Sub-agency:** Defense Federal Acquisition Regulations System
- **Federal Register citation:** 75 FR 48278
- **CFR reference:** 48 CFR 215
- **Publication date:** 2010-08-10
- **Effective date:** 2010-08-10
- **DOD docket:** DFARS Case 2006-D057
## Abstract

DoD is issuing a final rule to delete the DFARS language implementing section 852 of the National Defense Authorization Act for Fiscal Year 2007 that ensures that pass-through charges on contracts or subcontracts that are entered into for or on behalf of DoD are not excessive in relation to the cost of work performed by the relevant contractor or subcontractor. The interim DFARS rule language, which implements the requirements of section 852, was made obsolete with the publication of the FAR interim rule at 74 FR 52853 on October 14, 2009.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2010/08/10/2010-19672/defense-federal-acquisition-regulation-supplement-excessive-pass-through-charges)
---
*AI Analytics · CC0 1.0*