# Design Criteria for Dam and Lake Projects
> **US Army Corps of Engineers** · Final rule. · Published 2021-01-08 · Effective 2021-01-08 · 86 FR 1278
## Document
- **Document number:** 2020-27908
- **Category:** civil-works
- **Sub-agency:** US Army Corps of Engineers
- **Federal Register citation:** 86 FR 1278
- **CFR reference:** 33 CFR 220
- **Publication date:** 2021-01-08
- **Effective date:** 2021-01-08
- **DOD docket:** COE-2020-0009
## Abstract

This final rule removes the U.S. Army Corps of Engineers' part titled Design Criteria for Dam and Lake Projects. This part is out-of- date and otherwise covers internal agency operations that have no public compliance component or adverse public impact. Therefore, this part can be removed from the Code of Federal Regulations (CFR).

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2021/01/08/2020-27908/design-criteria-for-dam-and-lake-projects)
---
*AI Analytics · CC0 1.0*