# Rigging Equipment for Material Handling Construction Standard; Correction and Technical Amendment
> **Occupational Safety and Health Administration** · Final rule; correction and technical amendment. · Published 2012-04-18 · Effective 2012-04-18 · 77 FR 23117
## Document
- **Document number:** 2012-8881
- **Category:** osha-workplace-safety
- **Sub-agency:** Occupational Safety and Health Administration
- **Federal Register citation:** 77 FR 23117
- **CFR reference:** 29 CFR 1926
- **Publication date:** 2012-04-18
- **Effective date:** 2012-04-18
## Abstract

OSHA is correcting its sling standard for construction titled "Rigging Equipment for Material Handling" by removing the rated capacity tables and making minor, nonsubstantive revisions to the regulatory text.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2012/04/18/2012-8881/rigging-equipment-for-material-handling-construction-standard-correction-and-technical-amendment)
---
*AI Analytics · CC0 1.0*