← DOT non-FAA Federal Register rules

Buy America Requirements; Bi-Metallic Composite Conducting Rail

transit · Federal Transit Administration · Published 2009-06-25 · Effective 2009-07-27 · 74 FR 30237

Document

Document number
E9-14703
Federal Register citation
74 FR 30237
CFR reference
49 CFR 661
Type
Rule
Action
Final rule; correcting amendment.
Category
transit
Sub-agency
Federal Transit Administration
Publication date
2009-06-25
Effective date
2009-07-27
DOT docket
Docket No. FTA-2008-0057

Abstract

Following the two recent Buy America rulemakings pursuant to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), the Federal Transit Administration (FTA) received a petition for reconsideration of the treatment of bi-metallic composite conducting rail as a steel product that must be manufactured in the United States. Because FTA believed adopting the petitions through a Final Rule would have altered the regulatory environment without notice-and- comment from all affected parties who may have been unaware of the petition, FTA declined to accept the petition and instead issued a Notice of Proposed Rulemaking. Through this Final Rule, FTA is amending its Buy America regulation to include bi-metallic composite conducting rail on the list of traction power equipment. As such, bi-metallic rail need only consist of 60 percent domestic content, with final assembly taking place in the United States. In addition, FTA is amending Appendix A of section 661.7 to restore the public interest waivers for small purchases which was inadvertently deleted and to update a cross reference to the list of products exempted under the Buy American Act of 1933, and amending statutory references in the compliance certifications in section 661.12

Source

Authoritative
Federal Register document
Machine
JSON-LD · Markdown