Positive Train Control Systems

railroad-safety · Federal Railroad Administration · Published 2010-01-15 · Effective 2010-03-16 · 75 FR 2598

Document

Document number
E9-31362
Federal Register citation
75 FR 2598
CFR reference
49 CFR 229
Type
Rule
Action
Final rule; request for comment on specific issues.
Category
railroad-safety
Sub-agency
Federal Railroad Administration
Publication date
2010-01-15
Effective date
2010-03-16
DOT docket
Docket No. FRA-2008-0132, Notice No. 3

Abstract

FRA is issuing regulations implementing a requirement of the Rail Safety Improvement Act of 2008 that defines criteria for certain passenger and freight rail lines requiring the implementation of positive train control (PTC) systems. This final rule includes required functionalities of PTC system technology and the means by which PTC systems will be certified. This final rule also describes the contents of the PTC implementation plans required by the statute and contains the process for submission of those plans for review and approval by FRA. These regulations could also be voluntarily complied with by entities not mandated to install PTC systems. This is a final rule; however, FRA has identified specific provisions for which we are considering making changes to the final rule, if warranted by the public comments received. We expect to publish our response to those comments, including any possible changes to the rule made as a result of them, as soon as possible following the end of the comment period. However, the limited areas of this rule open for additional comment do not affect the requirement for railroads to prepare and submit plans in accordance with the deadlines established in this final rule.