# Revision of Existing Regulations Under the Natural Gas Act
> **US Department of Energy** · Final rule; Order on rehearing. · Published 2000-03-03 · Effective 2000-04-03 · 65 FR 11462
## Document
- **Document number:** 00-5116
- **Category:** other
- **Sub-agency:** US Department of Energy
- **Federal Register citation:** 65 FR 11462
- **CFR reference:** 18 CFR 157
- **Publication date:** 2000-03-03
- **Effective date:** 2000-04-03
- **Energy docket:** Docket No. RM98-9-002
## Abstract

On rehearing, the Federal Energy Regulation Commission reaffirms its basic determinations in Order Nos. 603 and 603-A that its regulations only allow minor changes to storage field operations and that facilities constructed to interconnect transporters under the Natural Gas Act can be constructed under a pipeline's blanket certificate authorization.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2000/03/03/00-5116/revision-of-existing-regulations-under-the-natural-gas-act)
---
*AI Analytics · CC0 1.0*