# Reimbursement for Costs of Remedial Action at Active Uranium and Thorium Processing Sites
> **US Department of Energy** · Final rule; Technical and administrative amendments. · Published 2003-06-03 · Effective 2003-07-03 · 68 FR 32955
## Document
- **Document number:** 03-13858
- **Category:** other
- **Sub-agency:** US Department of Energy
- **Federal Register citation:** 68 FR 32955
- **CFR reference:** 10 CFR 765
- **Publication date:** 2003-06-03
- **Effective date:** 2003-07-03
## Abstract

The Department of Energy (DOE) adopts several technical and administrative amendments to its procedural regulations governing the reimbursement of remedial action costs at active uranium and thorium processing sites. Since it was enacted in 1992, the original legislation authorizing the program has been amended four times to increase the amounts authorized for reimbursement and to make technical changes. Today's regulatory amendments reflect the legislative amendments and make other technical corrections that have been identified since the original rule was issued. None of the amendments raise substantive issues or represent changes in policy.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2003/06/03/03-13858/reimbursement-for-costs-of-remedial-action-at-active-uranium-and-thorium-processing-sites)
---
*AI Analytics · CC0 1.0*