# Adjustment of the Maximum Retrospective Deferred Premium
> **Nuclear Regulatory Commission** · Final rule. · Published 2003-08-07 · 68 FR 46929
## Document
- **Document number:** 03-20144
- **Category:** other
- **Sub-agency:** Nuclear Regulatory Commission
- **Federal Register citation:** 68 FR 46929
- **CFR reference:** 10 CFR 140
- **Publication date:** 2003-08-07
## Abstract

The Nuclear Regulatory Commission (NRC) is amending its regulations to increase the maximum secondary retrospective deferred premium for liability insurance coverage in the event of nuclear incidents at licensed, operating, commercial nuclear power plants with a rated capacity of 100,000 kW or more. Currently established at $83.9 million per reactor per incident (but not to exceed $10 million in any 1 year), the maximum secondary retrospective deferred premium is being increased to $95.8 million per reactor per incident (but not to exceed $10 million in any 1 year). The change is based on the aggregate percentage change of 14.2 percent in the Consumer Price Index (CPI) from December 1997 through March 2003. The Price-Anderson Amendments Act of 1988 requires that this inflation adjustment be made at least once each 5 years. The increase in the primary nuclear liability insurance layer, which was increased on January 1, 2003, to $300 million, is also reflected in this rule.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2003/08/07/03-20144/adjustment-of-the-maximum-retrospective-deferred-premium)
---