# Standardization of Generator Interconnection Agreements and Procedures
> **Federal Energy Regulatory Commission** · Final rule. · Published 2003-08-19 · Effective 2003-10-20 · 68 FR 49846
## Document
- **Document number:** 03-20157
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 68 FR 49846
- **CFR reference:** 18 CFR 35
- **Publication date:** 2003-08-19
- **Effective date:** 2003-10-20
- **Energy docket:** Docket No. RM02-1-000
## Abstract

The Federal Energy Regulatory Commission (Commission) is amending its regulations under the Federal Power Act to require public utilities that own, control, or operate facilities for transmitting electric energy in interstate commerce to file revised open access transmission tariffs containing standard generator interconnection procedures and a standard agreement that the Commission is adopting in this order and to provide interconnection service to devices used for the production of electricity having a capacity of more than 20 megawatts, under them. Any non-public utility that seeks voluntary compliance with the reciprocity condition of an open access transmission tariff may satisfy this condition by adopting these procedures and this agreement.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2003/08/19/03-20157/standardization-of-generator-interconnection-agreements-and-procedures)
---