# Standardization of Generator Interconnection Agreements and Procedures
> **Federal Energy Regulatory Commission** · Order on rehearing. · Published 2004-03-26 · 69 FR 15932
## Document
- **Document number:** 04-5989
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 69 FR 15932
- **CFR reference:** 18 CFR 35
- **Publication date:** 2004-03-26
- **Energy docket:** Docket No. RM02-1-001
## Abstract

The Federal Energy Regulatory Commission (Commission) reaffirms its determinations in Order No. 2003 and clarifies certain provisions. Order No. 2003 requires all public utilities that own, control, or operate facilities for transmitting electric energy in interstate commerce to file revised open access transmission tariffs containing standard generator interconnection procedures and a standard agreement that the Commission adopted in that order and to provide interconnection service under them to electric generating facilities having a capacity of more than 20 megawatts. Any non-public utility that seeks voluntary compliance with the reciprocity condition of an open access transmission tariff may satisfy this condition by adopting these revised procedures and agreement.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2004/03/26/04-5989/standardization-of-generator-interconnection-agreements-and-procedures)
---
*AI Analytics · CC0 1.0*