# Standardization of Small Generator Interconnection Agreements and Procedures; Order on Rehearing
> **Federal Energy Regulatory Commission** · Order on rehearing. · Published 2005-11-30 · 70 FR 71760
## Document
- **Document number:** 05-23461
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 70 FR 71760
- **CFR reference:** 18 CFR 35
- **Publication date:** 2005-11-30
- **Energy docket:** Docket No. RM02-12-001
## Abstract

The Federal Energy Regulatory Commission (Commission) grants rehearing in part, denies rehearing in part, and clarifies certain determinations in Order No. 2006. Order No. 2006 requires all public utilities that own, control, or operate facilities for transmitting electric energy in interstate commerce to file revised open access transmission tariffs containing standard small generator interconnection procedures and a standard small generator interconnection agreement, and to provide interconnection service under them to small generating facilities of no more than 20 megawatts.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2005/11/30/05-23461/standardization-of-small-generator-interconnection-agreements-and-procedures-order-on-rehearing)
---