# Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards
> **Federal Energy Regulatory Commission** · Final rule; correction. · Published 2006-03-08 · Effective 2006-03-20 · 71 FR 11505
## Document
- **Document number:** 06-2194
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 71 FR 11505
- **CFR reference:** 18 CFR 39
- **Publication date:** 2006-03-08
- **Effective date:** 2006-03-20
- **Energy docket:** Docket No. RM05-30-000
## Abstract

The Federal Energy Regulatory Commission (Commission) is correcting a final rule that appeared in the Federal Register of February 17, 2006 (71 FR 8662). The final rule establishes criteria that an entity must satisfy to qualify to be the Electric Reliability Organization (ERO) which the Commission will certify as the organization that will propose and enforce Reliability Standards for the Bulk-Power System in the United States, subject to Commission approval. The final rule also establishes procedures under which the ERO may propose new or modified Reliability Standards for Commission review and procedures governing an enforcement action for the violation of a Reliability Standard.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2006/03/08/06-2194/rules-concerning-certification-of-the-electric-reliability-organization-and-procedures-for-the)
---
*AI Analytics · CC0 1.0*