← Energy + Nuclear Federal Register rules

Decommissioning Planning

nuclear-waste · Nuclear Regulatory Commission · Published 2011-06-17 · Effective 2012-12-17 · 76 FR 35512

Document

Document number
2011-14267
Federal Register citation
76 FR 35512
CFR reference
10 CFR 20
Type
Rule
Action
Final rule.
Category
nuclear-waste
Sub-agency
Nuclear Regulatory Commission
Publication date
2011-06-17
Effective date
2012-12-17
Energy docket
NRC-2008-0030

Abstract

The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations to improve decommissioning planning and thereby reduce the likelihood that any current operating facility will become a legacy site. The amended regulations require licensees to conduct their operations to minimize the introduction of residual radioactivity into the site, which includes the site's subsurface soil and groundwater. Licensees also may be required to perform site surveys to determine whether residual radioactivity is present in subsurface areas and to keep records of these surveys with records important for decommissioning. The amended regulations require licensees to report additional details in their decommissioning cost estimate (DCE), eliminate the escrow account and line of credit as approved financial assurance mechanisms, and modify other financial assurance requirements. The amended regulations require decommissioning power reactor licensees to report additional information on the costs of decommissioning and spent fuel management.

Source

Authoritative
Federal Register document
Machine
JSON-LD · Markdown