# Interim Enforcement Policy for Certain Fire Protection Issues
> **Federal Energy Regulatory Commission** · Policy statement; revision. · Published 2011-07-12 · Effective 2011-07-12 · 76 FR 40777
## Document
- **Document number:** 2011-17291
- **Category:** hydroelectric
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 76 FR 40777
- **CFR reference:** 10 CFR 50
- **Publication date:** 2011-07-12
- **Effective date:** 2011-07-12
- **Energy docket:** NRC-2008-0486
## Abstract

The U.S. Nuclear Regulatory Commission (NRC or the Commission) is revising its interim Enforcement Policy on enforcement discretion for certain fire protection issues to extend the enforcement discretion to correspond with a submittal schedule for new license amendment requests (LARs). This interim policy affects licensees that are transitioning to use the National Fire Protection Association Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants" (NFPA 805).

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2011/07/12/2011-17291/interim-enforcement-policy-for-certain-fire-protection-issues)
---
*AI Analytics · CC0 1.0*