# System Restoration Reliability Standards
> **Federal Energy Regulatory Commission** · Final rule. · Published 2011-03-23 · Effective 2011-05-23 · 76 FR 16277
## Document
- **Document number:** 2011-6739
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 76 FR 16277
- **CFR reference:** 18 CFR 40
- **Publication date:** 2011-03-23
- **Effective date:** 2011-05-23
- **Energy docket:** Docket No. RM10-16-000
## Abstract

Under section 215 of the Federal Power Act, the Commission approves three Emergency Operations and Preparedness (EOP) Reliability Standards, EOP-001-1 (Emergency Operations Planning), EOP-005-2 (System Restoration from Blackstart Resources), and EOP-006-2 (System Restoration Coordination) as well as the definition of the term "Blackstart Resource" submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC), the Electric Reliability Organization certified by the Commission. The approved Reliability Standards require transmission operators, generation operators, and certain transmission owners and distribution providers to ensure that plans, facilities and personnel are prepared to enable system restoration from Blackstart Resources and require reliability coordinators to establish plans and prepare personnel to enable effective coordination of the system restoration process. The Commission also approves the NERC's proposal to retire four existing EOP Reliability Standards and a definition that are replaced by the Standards and definition approved in this Final Rule.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2011/03/23/2011-6739/system-restoration-reliability-standards)
---