# Integration of Variable Energy Resources
> **Federal Energy Regulatory Commission** · Final rule. · Published 2012-07-13 · Effective 2012-09-11 · 77 FR 41482
## Document
- **Document number:** 2012-15762
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 77 FR 41482
- **CFR reference:** 18 CFR 35
- **Publication date:** 2012-07-13
- **Effective date:** 2012-09-11
- **Energy docket:** Docket No. RM10-11-000
## Abstract

The Federal Energy Regulatory Commission is amending the pro forma Open Access Transmission Tariff to remove unduly discriminatory practices and to ensure just and reasonable rates for Commission- jurisdictional services. Specifically, this Final Rule removes barriers to the integration of variable energy resources by requiring each public utility transmission provider to: offer intra-hourly transmission scheduling; and, incorporate provisions into the pro forma Large Generator Interconnection Agreement requiring interconnection customers whose generating facilities are variable energy resources to provide meteorological and forced outage data to the public utility transmission provider for the purpose of power production forecasting.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2012/07/13/2012-15762/integration-of-variable-energy-resources)
---