← Energy + Nuclear Federal Register rules

Continuity of Operations Plan

other · US Department of Energy · Published 2012-07-25 · Effective 2012-07-25 · 77 FR 43488

Document

Document number
2012-18157
Federal Register citation
77 FR 43488
CFR reference
18 CFR 376
Type
Rule
Action
Final rule.
Category
other
Sub-agency
US Department of Energy
Publication date
2012-07-25
Effective date
2012-07-25
Energy docket
Docket No. RM12-13-000

Abstract

In this rule the Commission revises its regulations pertaining to its Continuity of Operations Plan to allow the Commission the discretion to better address not only long-term and catastrophic events but also short-term events including loss of power or water. The rule allows for greater discretion regarding: the activation and deactivation of the Continuity of Operations Plan and any suspension of Commission operations; the length of time that the Continuity of Operations Plan is in effect and the length of time that Commission operations are suspended; the deactivation schedule and the resumption of full Commission operations; and the rescheduling of hearings, conferences and meetings. The rule also adds items to the list of requirements which are suspended when Commission operations are suspended.

Source

Authoritative
Federal Register document
Machine
JSON-LD · Markdown