# Revisions to Electric Quarterly Report Filing Process
> **US Department of Energy** · Final rule. · Published 2012-11-30 · Effective 2013-04-01 · 77 FR 71288
## Document
- **Document number:** 2012-28230
- **Category:** other
- **Sub-agency:** US Department of Energy
- **Federal Register citation:** 77 FR 71288
- **CFR reference:** 18 CFR 35
- **Publication date:** 2012-11-30
- **Effective date:** 2013-04-01
- **Energy docket:** Docket No. RM12-3-000
## Abstract

The Federal Energy Regulatory Commission (Commission) amends its regulations to change the process for filing Electric Quarterly Reports (EQR). Due to technology changes that will render the current filing process outmoded, ineffective, and unsustainable, the Commission will discontinue the use of Commission-distributed software to file an EQR. Instead, the Commission adopts a web-based approach to filing EQRs that will allow a public or non-public utility to file an EQR directly through the Commission's Web site, either through a web interface or by submitting an Extensible Mark-Up Language-formatted file. By adopting a process with two options for filing EQRs, the Commission seeks to provide the flexibility needed to accommodate a public or non-public utility's technical preference. The Commission also requires a public or non-public utility to identify itself with a company identification number rather than the existing software-based EQR identifier. The changes to the process for filing EQRs will apply to EQR filings beginning with the third quarter 2013 EQR, which will provide data for July through September 2013.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2012/11/30/2012-28230/revisions-to-electric-quarterly-report-filing-process)
---
*AI Analytics · CC0 1.0*