# Interpretation of Protection System Reliability Standard
> **Federal Energy Regulatory Commission** · Final rule. · Published 2012-02-13 · 77 FR 7526
## Document
- **Document number:** 2012-3272
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 77 FR 7526
- **CFR reference:** 18 CFR 40
- **Publication date:** 2012-02-13
- **Energy docket:** Docket No. RM10-5-000
## Abstract

On November 17, 2009, the North American Electric Reliability Corporation (NERC) submitted a petition (Petition) requesting approval of NERC's interpretation of Requirement R1 of Commission-approved Reliability Standard PRC-005-1 (Transmission and Generation Protection System Maintenance and Testing). On December 16, 2010, the Commission issued a Notice of Proposed Rulemaking (NOPR). In the NOPR, the Commission proposed to accept the NERC proposed interpretation of Requirement R1 of Reliability Standard PRC-005-1, and proposed to direct NERC to develop modifications to the PRC-005-1 Reliability Standard through its Reliability Standards development process to address gaps in the Protection System maintenance and testing standard that were highlighted by the proposed interpretation. As a result of the comments received in response to the NOPR, in this order the Commission adopts the NOPR proposal to accept NERC's proposed interpretation. In addition, as discussed below, the Commission accepts, in part, NERC's commitment to address the concerns in the Protection System maintenance and testing standard that were identified by the NOPR within the Reliability Standards development process, and directs, in part, that the concerns identified by the NOPR with regard to reclosing relays be addressed within the reinitiated PRC-005 revisions.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2012/02/13/2012-3272/interpretation-of-protection-system-reliability-standard)
---
*AI Analytics · CC0 1.0*