electric-grid · Federal Energy Regulatory Commission · Published 2014-03-27 · Effective 2014-05-27 · 79 FR 17011
Document
Document number
2014-06725
Federal Register citation
79 FR 17011
CFR reference
18 CFR 40
Type
Rule
Action
Final rule.
Category
electric-grid
Sub-agency
Federal Energy Regulatory Commission
Publication date
2014-03-27
Effective date
2014-05-27
Energy docket
Docket No. RM13-16-000
Abstract
Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves the following Reliability Standards that were submitted to the Commission for approval by the North American Electric Reliability Corporation, the Commission-certified Electric Reliability Organization: MOD-025-2 (Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability), MOD- 026-1 (Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions), MOD-027-1(Verification of Models and Data for Turbine/Governor and Load Control or Active Power/ Frequency Control Functions), PRC-019-1 (Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection), and PRC-024-1 (Generator Frequency and Voltage Protective Relay Settings). The generator verification Reliability Standards help ensure that verified data is available for power system planning and operational studies by requiring the verification of generator equipment and capability needed to support Bulk-Power System reliability and promoting the coordination of important protection system settings.