# Reliability Standard for Geomagnetic Disturbance Operations
> **Federal Energy Regulatory Commission** · Final rule. · Published 2014-06-25 · Effective 2014-08-25 · 79 FR 35911
## Document
- **Document number:** 2014-14849
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 79 FR 35911
- **CFR reference:** 18 CFR 40
- **Publication date:** 2014-06-25
- **Effective date:** 2014-08-25
- **Energy docket:** Docket No. RM14-1-000 Order No. 797
## Abstract

Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves Reliability Standard EOP-010-1 (Geomagnetic Disturbance Operations). The North American Electric Reliability Corporation, the Commission-certified Electric Reliability Organization, submitted the Reliability Standard for Commission approval in response to a Commission directive in Order No. 779. Reliability Standard EOP-010-1 is designed to mitigate the effects of geomagnetic disturbances on the Bulk-Power System by requiring responsible entities to implement Operating Plans and Operating Procedures or Processes.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2014/06/25/2014-14849/reliability-standard-for-geomagnetic-disturbance-operations)
---
*AI Analytics · CC0 1.0*