# Generator Relay Loadability and Revised Transmission Relay Loadability Reliability Standards
> **Federal Energy Regulatory Commission** · Final rule. · Published 2014-07-23 · Effective 2014-09-22 · 79 FR 42670
## Document
- **Document number:** 2014-17229
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 79 FR 42670
- **CFR reference:** 18 CFR 40
- **Publication date:** 2014-07-23
- **Effective date:** 2014-09-22
- **Energy docket:** Docket Nos. RM13-19-000 and RM14-3-000
## Abstract

Pursuant to the section regarding Electric Reliability of the Federal Power Act, the Commission approves a new Reliability Standard, PRC-025-1 (Generator Relay Loadability), submitted by the North American Electric Reliability Corporation (NERC), the Commission- approved Electric Reliability Organization. In addition, the Commission approves Reliability Standard PRC-023-3 (Transmission Relay Loadability), also submitted by NERC, which revises a currently- effective standard pertaining to transmission relay loadability.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2014/07/23/2014-17229/generator-relay-loadability-and-revised-transmission-relay-loadability-reliability-standards)
---