# Revisions and Technical Corrections To Conform the Commission's Regulations to the Hydropower Regulatory Efficiency Act of 2013
> **Federal Energy Regulatory Commission** · Final rule. · Published 2014-10-01 · Effective 2015-02-23 · 79 FR 59105
## Document
- **Document number:** 2014-23204
- **Category:** hydroelectric
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 79 FR 59105
- **CFR reference:** 18 CFR 4
- **Publication date:** 2014-10-01
- **Effective date:** 2015-02-23
- **Energy docket:** Docket No. RM14-22-000
## Abstract

The Federal Energy Regulatory Commission (Commission) issues this Final Rule to amend its regulations to conform to the enacted Hydropower Regulatory Efficiency Act of 2013 (Hydropower Efficiency Act). Although the Commission has been complying with the Hydropower Efficiency Act, and made its compliance procedures available on its Web site, this Final Rule now formalizes the Commission's compliance procedures in its revised regulations on preliminary permits, small conduit hydroelectric facilities, and small hydroelectric power projects, and in a new subpart on qualifying conduit hydropower facilities. In addition, this Final Rule corrects grammatical and typographical errors. All revisions in this Final Rule are intended to be ministerial in nature.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2014/10/01/2014-23204/revisions-and-technical-corrections-to-conform-the-commissions-regulations-to-the-hydropower)
---
*AI Analytics · CC0 1.0*