# Disturbance Monitoring and Reporting Requirements Reliability Standard
> **Federal Energy Regulatory Commission** · Final rule. · Published 2015-09-25 · Effective 2015-11-24 · 80 FR 57704
## Document
- **Document number:** 2015-24278
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 80 FR 57704
- **CFR reference:** 18 CFR 40
- **Publication date:** 2015-09-25
- **Effective date:** 2015-11-24
- **Energy docket:** Docket No. RM15-4-000
## Abstract

The Federal Energy Regulatory Commission approves Reliability Standard PRC-002-2 (Disturbance Monitoring and Reporting Requirements) submitted by the North American Electric Reliability Corporation. The purpose of Reliability Standard PRC-002-2 is to have adequate data available to facilitate analysis of bulk electric system disturbances.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2015/09/25/2015-24278/disturbance-monitoring-and-reporting-requirements-reliability-standard)
---