# Transmission Operations Reliability Standards and Interconnection Reliability Operations and Coordination Reliability Standards
> **Federal Energy Regulatory Commission** · Final rule. · Published 2015-11-27 · Effective 2016-01-26 · 80 FR 73977
## Document
- **Document number:** 2015-30110
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 80 FR 73977
- **CFR reference:** 18 CFR 40
- **Publication date:** 2015-11-27
- **Effective date:** 2016-01-26
- **Energy docket:** Docket No. RM15-16-000, Order No. 817
## Abstract

The Commission approves revisions to the Transmission Operations and Interconnection Reliability Operations and Coordination Reliability Standards, developed by the North American Electric Reliability Corporation, which the Commission has certified as the Electric Reliability Organization responsible for developing and enforcing mandatory Reliability Standards. The Commission also directs NERC to make three modifications to the standards within 18 months of the effective date of the final rule.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2015/11/27/2015-30110/transmission-operations-reliability-standards-and-interconnection-reliability-operations-and)
---
*AI Analytics · CC0 1.0*