# Removing Profile Drawing Requirement for Qualifying Conduit Notices of Intent and Revising Filing Requirements for Major Hydroelectric Projects 10 MW or Less
> **Federal Energy Regulatory Commission** · Final rule. · Published 2021-08-05 · Effective 2021-10-04 · 86 FR 42710
## Document
- **Document number:** 2021-15511
- **Category:** hydroelectric
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 86 FR 42710
- **CFR reference:** 18 CFR 4
- **Publication date:** 2021-08-05
- **Effective date:** 2021-10-04
- **Energy docket:** Docket No. RM20-21-000
## Abstract

In this final rule, the Federal Energy Regulatory Commission (Commission) is amending its regulations governing the filing requirements for qualifying conduits and certain major hydroelectric power projects. Specifically, the Commission is removing the requirement that a notice of intent to construct a qualifying conduit include a profile drawing showing the source of the hydroelectric potential in instances where a dam would be constructed in association with the facility and extending the licensing requirements that currently apply to major projects up to 5 megawatts (MW) to major projects 10 MW or less, consistent with the amended definition of a small hydroelectric power project in the Hydropower Regulatory Efficiency Act of 2013.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2021/08/05/2021-15511/removing-profile-drawing-requirement-for-qualifying-conduit-notices-of-intent-and-revising-filing)
---