← Energy + Nuclear Federal Register rules

Internal Network Security Monitoring for High and Medium Impact Bulk Electric System Cyber Systems

electric-grid · Federal Energy Regulatory Commission · Published 2023-02-09 · Effective 2023-04-10 · 88 FR 8354

Document

Document number
2023-01453
Federal Register citation
88 FR 8354
CFR reference
18 CFR 40
Type
Rule
Action
Final action.
Category
electric-grid
Sub-agency
Federal Energy Regulatory Commission
Publication date
2023-02-09
Effective date
2023-04-10
Energy docket
Docket No. RM22-3-000

Abstract

The Federal Energy Regulatory Commission (Commission) is directing the North American Electric Reliability Corporation (NERC) to develop and submit within 15 months of the effective date of this final action for Commission approval new or modified Reliability Standards that require internal network security monitoring within a trusted Critical Infrastructure Protection networked environment for all high impact bulk electric system (BES) Cyber Systems with and without external routable connectivity and medium impact BES Cyber Systems with external routable connectivity. In addition, the Commission directs NERC to perform a study of all low impact BES Cyber Systems with and without external routable connectivity and medium impact BES Cyber Systems without external routable connectivity, as set forth in the final action, and to submit its study report to the Commission within 12 months of the issuance of this final action.

Source

Authoritative
Federal Register document
Machine
JSON-LD · Markdown