# Regulatory Guide: Quality Assurance Program Criteria (Design and Construction)
> **Nuclear Regulatory Commission** · Final guide; issuance. · Published 2023-09-11 · 88 FR 62292
## Document
- **Document number:** 2023-19548
- **Category:** other
- **Sub-agency:** Nuclear Regulatory Commission
- **Federal Register citation:** 88 FR 62292
- **CFR reference:** 10 CFR 50
- **Publication date:** 2023-09-11
- **Energy docket:** NRC-2023-0054
## Abstract

The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 6 to Regulatory Guide (RG), 1.28, "Quality Assurance Program Criteria (Design and Construction)". RG 1.28, Revision 6, endorses, with certain clarifications and regulatory positions, Part I and Part II requirements included in NQA-1-2017, NQA-1-2019, and NQA-1-2022 for the implementation of a quality assurance (QA) program during the design and construction phases of nuclear power plants and fuel reprocessing plants.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2023/09/11/2023-19548/regulatory-guide-quality-assurance-program-criteria-design-and-construction)
---