# Building for the Future Through Electric Regional Transmission Planning and Cost Allocation
> **US Department of Energy** · Order on rehearing and clarification. · Published 2024-12-06 · Effective 2025-01-06 · 89 FR 97174
## Document
- **Document number:** 2024-27982
- **Category:** other
- **Sub-agency:** US Department of Energy
- **Federal Register citation:** 89 FR 97174
- **CFR reference:** 18 CFR 35
- **Publication date:** 2024-12-06
- **Effective date:** 2025-01-06
- **Energy docket:** Docket No. RM21-17-001
## Abstract

In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, sets aside, in part, and clarifies Order No. 1920, which required transmission providers to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs. Order No. 1920 also directed other reforms to improve coordination of regional transmission planning and generator interconnection processes, require consideration of certain alternative transmission technologies in regional transmission planning processes, and improve transparency of local transmission planning processes and coordination between regional and local transmission planning processes.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2024/12/06/2024-27982/building-for-the-future-through-electric-regional-transmission-planning-and-cost-allocation)
---