# Building for the Future Through Electric Regional Transmission Planning and Cost Allocation
> **US Department of Energy** · Order on rehearing and clarification. · Published 2025-04-28 · Effective 2025-01-06 · 90 FR 17692
## Document
- **Document number:** 2025-06941
- **Category:** other
- **Sub-agency:** US Department of Energy
- **Federal Register citation:** 90 FR 17692
- **CFR reference:** 18 CFR 35
- **Publication date:** 2025-04-28
- **Effective date:** 2025-01-06
- **Energy docket:** Docket No. RM21-17-003
## Abstract

In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2025/04/28/2025-06941/building-for-the-future-through-electric-regional-transmission-planning-and-cost-allocation)
---
*AI Analytics · CC0 1.0*