Critical Infrastructure Protection Reliability Standard CIP-015-1-Cyber Security-Internal Network Security Monitoring
electric-grid · Federal Energy Regulatory Commission · Published 2025-07-02 · Effective 2025-09-02 · 90 FR 28889
Document
Document number
2025-12309
Federal Register citation
90 FR 28889
CFR reference
18 CFR 40
Type
Rule
Action
Final action.
Category
electric-grid
Sub-agency
Federal Energy Regulatory Commission
Publication date
2025-07-02
Effective date
2025-09-02
Energy docket
Docket No. RM24-7-000
Abstract
The Federal Energy Regulatory Commission (Commission) approves proposed Reliability Standard CIP-015-1 (Cyber Security--Internal Network Security Monitoring), which the North American Electric Reliability Corporation (NERC), submitted in response to a Commission directive. In addition, the Commission directs NERC to develop certain modifications to proposed Reliability Standard CIP-015-1 to extend internal network security monitoring to include electronic access control or monitoring systems and physical access control systems outside of the electronic security perimeter. The Commission also provides greater clarity about the term CIP-networked environment as it is used in proposed Reliability Standard CIP-015-1.