# Standards For Electronic Bulletin Boards Required Under Part 284 of the Commission's Regulations
> **Federal Energy Regulatory Commission** · Final rule. · Published 1994-01-05 · 59 FR 516
## Document
- **Document number:** 94-45
- **Category:** natural-gas-pipeline
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 59 FR 516
- **CFR reference:** 18 CFR 284
- **Publication date:** 1994-01-05
- **Energy docket:** Federal Register: January 5, 1994
## Abstract

The Federal Energy Regulatory Commission (Commission) is issuing a final rule adopting regulations to standardize the content of, and procedures for accessing, information relevant to the availability of service on interstate pipelines. The Commission's standards will require pipelines to make this information available on Electronic Bulletin Boards (EBBs) and through downloadable files and will detail procedures and protocols for EBB operation and file transfers.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/1994/01/05/94-45/standards-for-electronic-bulletin-boards-required-under-part-284-of-the-commissions-regulations)
---
*AI Analytics · CC0 1.0*