Elimination of Reporting Requirement and 30-Day Hold in Loading Spent Fuel After Preoperational Testing of Independent Spent Fuel Storage or Monitored Retrievable Storage Installations

nuclear-waste · Nuclear Regulatory Commission · Published 1999-04-12 · Effective 1999-05-12 · 64 FR 17510

Document

Document number
99-9041
Federal Register citation
64 FR 17510
CFR reference
10 CFR 72
Type
Rule
Action
Final rule.
Category
nuclear-waste
Sub-agency
Nuclear Regulatory Commission
Publication date
1999-04-12
Effective date
1999-05-12

Abstract

The Nuclear Regulatory Commission (NRC) is amending its regulations to eliminate the requirement that a report of the preoperational testing of an independent spent fuel storage installation or monitored retrievable storage installation be submitted to the NRC at least 30 days before the receipt of spent fuel or high- level radioactive waste. Experience has shown that the NRC staff does not need the report or the holding period because the NRC staff is on site and evaluates preoperational testing as it occurs. This amendment will eliminate an unnecessary regulatory impact on licensees.