# Limited Work Authorizations for Nuclear Power Plants
> **Nuclear Regulatory Commission** · Final rule. · Published 2007-10-09 · Effective 2007-11-08 · 72 FR 57416
## Document
- **Document number:** E7-19312
- **Category:** nuclear-licensing
- **Sub-agency:** Nuclear Regulatory Commission
- **Federal Register citation:** 72 FR 57416
- **CFR reference:** 10 CFR 2
- **Publication date:** 2007-10-09
- **Effective date:** 2007-11-08
## Abstract

The Nuclear Regulatory Commission (NRC) is amending its regulations applicable to limited work authorizations (LWAs), which allow certain construction activities on production and utilization facilities to commence before a construction permit or combined license is issued. This final rule modifies the scope of activities that are considered construction for which a construction permit, combined license, or LWA is necessary, specifies the scope of construction activities that may be performed under an LWA, and changes the review and approval process for LWA requests. The NRC is adopting these changes to enhance the efficiency of its licensing and approval process for production and utilization facilities, including new nuclear power reactors.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2007/10/09/E7-19312/limited-work-authorizations-for-nuclear-power-plants)
---