# Revision of Annual Charges to Public Utilities (Westar Energy, Inc. and Kansas Gas and Electric Company)
> **Federal Energy Regulatory Commission** · Final rule; order on remand and announcement of policy. · Published 2007-03-22 · Effective 2007-03-15 · 72 FR 13442
## Document
- **Document number:** E7-5052
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 72 FR 13442
- **CFR reference:** 18 CFR 382
- **Publication date:** 2007-03-22
- **Effective date:** 2007-03-15
- **Energy docket:** Docket No. RM00-7-012
## Abstract

In this order, the Federal Energy Regulatory Commission (Commission) addresses issues raised by the United States Court of Appeals for the District of Columbia Circuit (D.C. Circuit) on remand in Westar Energy Inc., Docket No. RM87-3-000. The Commission here affirms its regulation at 18 CFR 382.201 (2006), adopted in Order No. 641, allowing correction of transmission volumes, but in response to the remand allows Westar Energy, Inc. to submit corrected transmission volumes out-of-time. The Commission clarifies going forward that it will accept timely FERC Reporting Requirement No. 582 (FERC 582) corrections but will accept only those late-filed FERC 582 corrections that are discovered through a Commission-conducted audit and that correct previously under- reported transmission volumes. When a public utility underreports, it is assessed comparatively smaller annual charges, and other public utilities are assessed relatively larger annual charges thereby subsidizing those utilities who underreport.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2007/03/22/E7-5052/revision-of-annual-charges-to-public-utilities-westar-energy-inc-and-kansas-gas-and-electric-company)
---
*AI Analytics · CC0 1.0*