# Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards
> **Federal Energy Regulatory Commission** · Final rule. · Published 2008-07-28 · Effective 2008-08-27 · 73 FR 43613
## Document
- **Document number:** E8-17196
- **Category:** electric-grid
- **Sub-agency:** Federal Energy Regulatory Commission
- **Federal Register citation:** 73 FR 43613
- **CFR reference:** 18 CFR 40
- **Publication date:** 2008-07-28
- **Effective date:** 2008-08-27
- **Energy docket:** Docket No. RM08-7-000
## Abstract

Pursuant to section 215 of the Federal Power Act, the Federal Energy Regulatory Commission (Commission) approves five of six modified Reliability Standards submitted to the Commission for approval by the North American Electric Reliability Corporation (NERC). The Commission directs NERC to submit a filing that provides an explanation regarding one aspect of the sixth modified Reliability Standard submitted by NERC. The Commission also approves NERC's proposed interpretations of five specific requirements of Commission-approved Reliability Standards.