Industry Codes and Standards; Amended Requirements; Confirmation of Effective Date
other · Nuclear Regulatory Commission · Published 2009-10-19 · Effective 2009-10-19 · 74 FR 53402
Document
Document number
E9-25049
Federal Register citation
74 FR 53402
CFR reference
10 CFR 50
Type
Rule
Action
Direct final rule: Confirmation of effective date.
Category
other
Sub-agency
Nuclear Regulatory Commission
Publication date
2009-10-19
Effective date
2009-10-19
Energy docket
NRC-2008-0663
Abstract
The Nuclear Regulatory Commission (NRC) is confirming the effective date of October 19, 2009, for the direct final rule that was published in the Federal Register on August 5, 2009. This direct final rule amended the NRC's regulations on governing vessel head inspection requirements. This amendment revised the upper range of the percentage of axial flaws permitted in a specimen set used for the qualification of nondestructive examination systems (procedures, personnel and equipment), which are used in the performance of inservice inspection (ISI) of pressurized water reactor (PWR) upper vessel head penetrations. This amendment was made as a result of the withdrawal of a stakeholder's recommendation necessitated by a typographical error in the original recommendation with respect to the maximum percentage of flaws that should be oriented axially.