← EPA enforcement cases

The Lauren Group, LLC / New Center Park (LAR10E985)

Administrative - Formal · FY2008 · — · Unilateral Administrative Order Without Adjudication · 1000009899

Penalty
Cost recovery
Compliance action

Case

Case Number
06-2008-2016
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
Self-disclosure
N

Defendants (1)

Summary

THE LAUREN GROUP, LLC (LAR10E985): A storm water compliance inspection was conducted on May 20, 2008, at the residential construction site of the New Center Park Subdivision on East Kaliste Saloom Road, Lafayette, LA. The inspection was conducted by Ken Aubuchon, James Eng, and Diana McDonald, EPA Region 6. Accompanying the EPA inspectors were staff from the Louisiana Department of Environmental Quality (LDEQ) Acadiana Regional Office and staff from the Lafayette Municipal Separate Storm Sewer System (MS4). The Lauren Group, LLC, is the owner/developer of the construction site. Mr. GregGachassin, President, was contacted prior to the inspection and declined to accompany inspectors on site inspection. While the operator had permit coverage, there was no Storm Water Pollution Prevention Plan to review, and no inspections documented to review. There were minimum storm water controls on site. There was also evidence of sediment runoff from the site. An administrative order was drafted and routed for signature. Contacts: Ken Aubuchon, (6EN-ASH) 281-983-2151, James Eng (6EN-ASH) 281-983-2148, and Diana McDonald (6EN-WM) 214-665-7495

Source

Authoritative
EPA ECHO
Machine