8/15/08 - COMPLIANCE ORDER ISSUED. VIOLATION: THE SYSTEM FAILED TO SUBMIT A STANDARD MONITORING PLAN, A SYSTEM SPECIFIC STUDY PLAN, OR A 40/30 CERTIFICATION PLAN TO THE EPA BY APRIL 1, 2008, IN VIOLATION OF 40 CFR 141.600(c)(1). ORDER REQUIRES: WITHIN 30 DAYS THE SYSTEM SHALL PREPARED A STANDARD MONITORING PLAN IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.601(a); OR A SYSTEM SPECIFIC STUDY PLAN IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.602(a); OR A 40/30 CERTIFICATION IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.603(b).
WITHIN 30 DAYS, THE SYSTEM SHALL SUBMIT THE STANDARD MONITORING PLAN OR THE SYSTEM SPECIFIC STUDY PLAN OR THE 40/30 CERTIFICATION TO EPA.