← EPA enforcement cases

BALL CAMP RESIDENTIAL PARTNERS - HIGHERS ESTATE

Administrative - Formal · FY2008 · — · Final Order With Penalty · 1000015954

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2008-4512
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (2)

Summary

7/23/2008 - CONSENT AGREEMENT AND FINAL ORDER ISSUED, ASSESSING A PENALTY OF $20,000. RESPONDENT SHALL MAKE PAYMENT WITHIN THIRTY DAYS. ORDER ALLEGES: AS A RESULT OF THE COMPLIANCE STORM WATER EVALUATION INSPECTION ( CSWEI ) PERFORMED ON NOVEMBER 15, 2006, RESPONDENT FAILED TO COMPLY WITH: A) SECTION 3.3.1 OF THE PERMIT BY NOT RETAINING A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN ( SWPPP ) ON SITE, OR IF NOT ON-SITE, POST THE LOCATION OF THE SWPPP, ALONG WITH A CONTACT PHONE NUMBER ON-SITE; B) SECTION 3.3.2 OF THE PERMIT BY NOT POSTING THE FOLLOWING NEAR THE MAIN ENTRANCE OF THE FACILITY ACCESSIBLE TO THE PUBLIC: (1) THE NOC; (2) NAME, COMPANY NAME, E-MAIL ADDRESS (IF AVAILABLE), TELEPHONE NUMBER AND ADDRESS OF THE FACILITY OWNER OR LOCAL CONTACT PERSON; (3) A BRIEF DESCRIPTIOIN OF THE PROJECT; AND (4) THE LOCATION OF THE SWPPP IF IT WAS NOT LOCATED ON-SITE; (C) SECTION 3.5.3.1(a), (b), AND (e)OF THE PERMIT BY NOT PROPERLY INSTALLING AND MAINTAING ALL ENGINEERED EROSION PREVENTION AND SEDIMENT CONTROLS, INCLUDING SILT FENCES AND A SEDIMENTATION POND; (D) SECTION 3.5.3.1(n) OF THE PRMIT BY NOT INSTALLING AND MAINTAINING A RAIN GAUGE; (E) SECTION 3.5.3.2 OF THE PERMIT BY FAILING TO IMPLEMENT TEMPORARY OR PERMANENT STABILIZATION OAT THE FACILITY NOT LATER THAN FIFREEN (15) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE FACILITY HAS TEMPORARILY OR PERMANENTLY CEASED; (F) SECTION 3.5.3.3 OF THE PERMIT BY NOT HAVING A CLEAN-OUT MARKER AND NOT MAINTAINING THE SE

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown