# Oil Patch Petroleum Inc
> **Administrative - Formal** · FY2003 · — · Final Order With Penalty
## Case
- **Activity ID:** `100611`
- **Case Number:** 06-2003-4354
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Oil Patch Petroleum Inc (complaint) (settlement)
## Summary

Inadequate or no prediction of equipment failure which could result in discharges

No training on the operation and maintenance of equipment to prevent discharges

No training on the applicable laws, rules, and regulations

Spill prevention briefings are not scheduled and conducted periodically 

Plan has inadequate or no discussion of facility drainage

Adequate records of drainage events are not maintained

Records of inspections of aboveground tanks are not maintained

Spill

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*