7/31/2003 - Compliance Order issued. Respondent failed to properly maintain the following erosion and sediment controls: silt fencing, sediment traps, and storm drain inlet protections around facility (Part VI.D. and Part VI.N). Failed to install and maintain rip rap around the riser at sedimentation ponds #1 and #2 (Part VI.D. and Part VI.N). Failed to remove sediment from and maintain sedimentation ponds (Part VI.D. and Part VI.N). Failed to provide inlet pipe protection at sedimentation ponds (VI.D. and Part VI.N). In violation of CWA Sections 302 & 40