# Cedyco Corporation (Vermilion Land Bay Company)
> **Administrative - Formal** · FY2003 · — · Final Order With Penalty
## Case
- **Activity ID:** `101563`
- **Case Number:** 06-2003-4357
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Cedyco Corporation (complaint) (settlement)
## Summary

*  Plan not certified by a professional engineer
*  Inspections required by 40 CFR Part 112 are not in accordance with written procedures    developed for the facility.
*  Written procedures and a record of inspections are not signed by facility supervisor.
*  Written procedures and a record of inspections are not made part of the plan.
*  Written procedures and a record of inspections are not maintained for three years.
*  No training on the operation and maintenance of equipment to prevent discharges.
*  No training on the applicable laws, rules, and regulations
*  Spill prevention briefings are not scheduled and conducted periodically.
*  Adequate records of drainage events are not maintained.
*

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*