# Dueitt Oil Company
> **Administrative - Formal** · FY2003 · — · —
## Case
- **Activity ID:** `101648`
- **Case Number:** 06-2003-4365
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** —
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Dueitt Oil Company (complaint) (settlement)
## Summary

*  Plan not certified by a professional engineer
*  Inspections required by 40 CFR Part 112 are not in accordance with written procedures developed for the facility.
*  Written procedures and a record of inspections are not made part of the plan
*  Written procedures and a a record of inspections are not maintained for three years.
*  Excessive vegetation which affects the integrity of the containment system.
*  Walls of containment system are slightly eroded or have low areas.
*  Adequatae records of drainage events are not maintained.
*  Outside of tank not frequently observed for signs of deterioration, leaks which might cause a spill, or accumulation of oil inside diked area.
*  Secondary containment inadequate for mobile or portable storage tanks.
*  Aboveground valves and pipelines are not inspected regularly.
*  Containment system does not hold at least the maxiumum capacity of the largest single compartment of any tank car or tank truck.
*  Facility not fully fenced and entrance gates are not locked and/or guarded when plant is unattended or not in production.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*