# Roadway Express, Inc.
> **Administrative - Formal** · FY2003 · — · Final Order With Penalty
## Case
- **Activity ID:** `102730`
- **Case Number:** 06-2003-4375
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Roadway Express, Inc. (complaint) (settlement)
## Summary

** No Spill Prevention Control and Countermeasure Plan.
** No designated person responsilbe for spill prevention
** Spill prevention briefings are not scheduled and conducted periodically.
** Drainage from undiked areas not into ponds, lagoons, or catchment basins, or no diversion system to return spills to the facility.
** Records of inspections of aboveground tanks are not maintained.
** secondary containment inadequate for mobile or portable storage tanks.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*