← EPA enforcement cases

LEED FOUNDRY, INC

Administrative - Formal · FY2004 · — · Final Order With Penalty · 108409

Penalty
Cost recovery
Compliance action

Case

Case Number
03-2004-0061
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

THIS FACILITY VIOLATED BOTH RCRA AND CWA. THERE ARE 15 COUNTS TO THIS COMPLAINT. LEED FOUNDRY, INC PRODUCES GRAY IRON CASTINGS FROM ITS FACILITY, LOCATED IN ST. CLAIR, PENNSYLVANIA. EPA INSPECTORS WERE PRESENT ON 09/11/02 & 10/24/02 AND DETERMINED THAT THERE WERE ACCUMULATIONS OF DUST ON THE GROUND, ETC. BASED ON ANALYSIS OF THIS DUST, IT WAS FOUND THAT LEVELS OF LEAD & CADMIUM WERE PRESENT. THESE ARE TOXIC CONTAMINANTS. THE FOLLOWING COUNTS PROVIDE A SUMMARY OF THE VIOLATIONS: (1) STORAGE W/O PERMIT OR INTERIM STATUS; (2) DISPOSAL W/O PERMIT OR INTERIM STATUS; (3) FAILURE TO OBTAIN AN EPA IDENTIFICATION NUMBER; (4) FAILURE TO TRAIN PERSONNEL; (5) FAILURE TO DEVELOP A CONTINGENCY PLAN; (6) FAILURE TO MEET DESIGN & OPERATING REQUIREMENTS FOR WASTE PILES; (7) FAILURE TO INSTITUTE A DETECTION MONITORING PROGRAM; (8) FAILURE TO HAVE A WRITTEN CLOSURE PLAN; (9) FAILING TO DEVELOP & KEEP A COST ESTIMATE FOR CLOSURE; (10) FAILURE TO MINIMIZE RELEASES; (11) FAILURE TO PROPERLY MANAGE CONTAINERS; (12) ILLEGAL LAND DISPOSAL; (13) ILLEGAL STORAGE OF RESTRICTED WASTES; CWA (14) ILLEGAL DISCHARGE AND (15) FAILURE TO APPLY FOR A STORMWATER DISCHARGE PERMIT. THE PROPOSED PENALTY IS $157,500. A COMPLIANCE ORDER LISTING COMPLIANCE TASK (A-I) IS ALSO INCLUDED IN THE COMPLAINT. THESE COMPLIANCE TAKS REFER TO THE RCRA VIOLATIONS

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown