← EPA enforcement cases

FURTADO, MANUEL (BRISTOL)

Judicial · FY1999 · — · Final Order With Specified Cost Recovery · 1102

Penalty
Cost recovery
Compliance action

Case

Case Number
01-1999-0113
Type
Judicial
Lead
EPA
Outcome
Final Order With Specified Cost Recovery
Multimedia
N
Self-disclosure
N

Defendants (1)

Summary

SITE ENCOMPASSES 20 AND 22 BIRCH SWAMP RD AND A PARCEL OF TOWN CONSERVATION LAND IN WARREN, RI. MANUEL FURTADO JR. OWNED 20 AND 22 BIRCH SWAMP LAND FROM 1983 TO 1986. IN 1986 FURTADO SOLD 20 BIRCH SWAMP RD, BUT RETAINED OWNERSHIP AND OPERATED BRISTOL SANDBLASTING COMPANY. THE COMPANY CONDUCTED SANDBLASTING ACTIVITIES ON VEHICLES AT 22 BIRCH SWAMP RD. IN ADDITON, THE COMPANY SANDBLASTED BUILDINGS AT OTHER LOCATION THE COMPANY AND MR FURTADO DISPOSED OF SANDBLASTING RESIDUE CONTAINING LEAD AND POSSIBLY PCBS AT THE SITE. EPA CONDUCTED A REMOVAL ACTION AT THE SITE WHICH CONSISTED PRIMARILY OF EXCAVATION AND OFF-SITE DISPOSAL OF CONTAMINATED SOIL. EPA INCURRED $1,538,769 IN RESPONSE COSTS.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown